Today 4 PM
Search50,000+items
More FromSTAPLES
Out of stock

Staples Arc Notebook Project Planner Filler Paper Lettersized White 50 Sheets

Out Of Stock
Description

The Staples® Arc system letter-size premium refill paper in white measuring 8-1/2" x 11" contains 50 project-planner sheets to hold all of your great ideas.

The Arc system premium refill paper in white features heavyweight, letter-size paper. This paper measures 8 1/2"x 11" and has 50 repositionable, project-planner sheets.