YWBL-WH 20PCS 450V 22UF 105 Long Leads Axial Electrolytic Polarized Capacitor Kit Electronic Component Set
Out Of Stock
Description
Features, electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its surface, convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specifications, Working Voltage, DC 450V Surge voltage, DC 500V Value, 22uf Capacitance Tolerance, 20% Operating temperature, 105°C Dissipation Factor, <0.24 at 20°C/120Hz Dimensions, 16×27mm 0.63×1.06inch Lead type length, Tin plating copper layer Lead length, 38mm 1.5inch Type, Polarized Quantity, 20pcs Weight, Approx. 79g Package Included, 20×Electrolytic Capacitor Working Voltage, DC 450V Surge voltage, DC 500V Value, 22uf Capacitance Tolerance, ±20% Operating temperature, 105°C Dissipation Factor, <0.24 at 20°C/120Hz Dimensions, 16×27mm 0.63×1.06inch Lead type length, Tin plating copper layer Lead length, 38mm 1.5inch Type, Polarized Quantity, 20pcs Weight, Approx. 79g.